How to begin repair works associated with the apartment?

The very first stage of the particular repair of older apartments is typically the destruction and taking out first of all from the dilapidated walls and partition surfaces, removing the wall structure and ceiling coating. This stage is usually one of the most “dirty” stages of the repair.

A single more being among the most crucial and “dusty” works is the windows block replacement. You ought to do this first of all because dirt and dirt will probably be unallowable during following stages in addition to it is restricted at all to be able to open windows during painting and wallpapers works (large falls of the temp and moisture are unallowable). After mounting windows and windowsills it is essential to pack these people immediately in polyethylene film and to cover windowsills within addition from the fiberboard (in order to prevent scratches).

The next phase is wiring. Electrical wiring can be installed in walls or even along the floor. Wiring is produced inside the pipes to ensure electric safety and boost reliability. The tube protects wiring through external damages plus allows to substitute the wire entirely without breaking surfaces and floor basically by inserting the newest wire instead of the old one.

House Painting employs the wiring. The frequent mistake throughout the simultaneous performing of such functions occurs when staff forget to lay down out among the wires and house artists have already drunk and smoothed out your wall. As the result, additional performs are necessary in order to seal chases on the finished wall. Typically the places of typically the feed switch plus wall outlet location and the number should be thought-out inside advance. The scheme of power wiring is usually included in to the design project.

Afterwards the program must be prepared to service in circumstance of failures. Within addition to the wirings, the telephone wire and the TV SET cable are organized. The power wire should not be laid out near the telephone and antenna wires to avoid noise pickup and interference. Probably the most peculiar instant is laying out the TV cable connection. In order to be able to make two (or three) TV makes its presence felt the apartment the 2nd cable is usually simply “firmly soldered” in parallel, thus the cable resistance is lowered. Because a result, the image quality is deteriorated, many programs cannot be received in addition to etc. In buy to avoid this kind of situation it will be necessary to request a specialist along with special equipment. He will gauge the signal level of the each TV-feeder and install TV-amplifiers or even TV-filters.

Painting is among the most long-term process, this is why it is carried out simultaneously in all premises, if it is achievable. Paintings Studio are associated with the technologies. Each applied layer of the plaster (or filling in finishing) must dry out completely prior to the work will continue.

Functions in sanitary arrangements and the cooking area begin simultaneously with house painting. It is best to fulfill apparent “dirty” works inside the first place and simultaneously. In accordance with the program of the sanitary technician location welding, wall chasing and pipe run usually are conducted. Steam rad admissions are prepared, taps and mounting brackets are mounted, yet radiators are certainly not installed.

Then works in sanitary arrangements usually are conducted based on the program. The bath will be mounted, then walls are smoothed out and the tile is laid on walls. The subsequent stage is putting together ceiling and putting tiles on the floor. And at last other hygienic devices, mixers plus accessories are installed.

After wiring, unit installation of rosette dishes and terminal boxes the voltage is checked in every level. Ends of wiring are insulated and laid out in to rosette plates. Sockets and breakers are certainly not installed during this stage in buy to save their own surface appearance. The particular finish puttying of walls is carried out simultaneously. The scientifically exact control of drying out of the layer of the plaster (filling) is transported out by drymeter. It is the special instrument of which measures moisture associated with the material.

These stage is the means of fill. Fill up may be made with different materials – from usual brickwork cement-sand mixture in order to self-aligning floors. The particular advantage of typically the simple mixture is its cheapness, typically the disadvantage is that such mixture is much harder in-line at the degree and the ultimate dry time associated with such fill is usually 40 days, just then the next stage of the particular work with floor may be conducted, we. e. the period is usually too long. Self-leveling self-aligning floors are more expensive, but more technological. Aiming occurs almost “automatically” i. e. fluid solution of blend is poured out, then it runs and you receive the horizontal surface. The final dried out time is two weeks i. e. you have significant time economy. The system “warm floor” is mounted into the fill. When the so-called “wet processes” are inapplicable the technology regarding the dry aiming (the fill technology) is used angles for floors together with adjustable floor battens are mounted.

After fill door bins and door usually are installed. Installation of doorways must take in to the account density of future flooring. After installation the door can be used off its hinges and removed right up until the end regarding repair or packed into polyethylene movie to protect from damages. Simultaneously threshold may be painted and the tile may be laid in this premises where it had been planned. The floor tile must be set around the absolutely dry out overlay.

Finishing regarding the floor mounting depends on typically the planned covering. Inside most cases (if finish covering is not the tile) fill up is covered simply by bitumen mastic and plywood sheets are laid. They usually are fixed to the floor by self-tapping screws. One plywood linen is fixed simply by 30-50 self-tapping anchoring screws to provide typically the close fixing regarding plywood and extensive service from the ground without squeak plus bulging. The particle board gives the extra heat- and acoustic insulation. After mounting of the hdf is finished, wallpaper regarding painting can become pasted on walls.

In premises where finish covering of the floor is usually laminated flooring or even parquet hoard, the normal wallpapers are pasted (not for painting) in the first place. Then the flooring is installed.

If finish masking in the floor will be the block parquet, the parquet is usually laid to begin with, and then it is scraped and covered by simply one layer associated with lacquer. After this the ordinary wall-papers are pasted and the parquet is included in the rest layers of lacquer (depending around the quality associated with the parquet plus lacquer). The described consequence is associated only with these kinds of scrambling process whenever the great sum of dust is usually created. In spite of the fact that great floor grinders are usually equipped with typically the vacuum cleaner, typically the sufficient amount regarding dust is brought on on surrounding subject matter including walls. Dirt is very tartish and is badly washed off. That will is why in order not to destruction wallpapers, they usually are pasted after rushing and in order the parquet tend not to absorb the excess moisture it will be covered by the main one layer of lacquer before wallpaper pasting.

After this the particular main works may be considered in order to be finished. That is left simply to install the plinths, decorative elements, breakers and sockets, drape holders, to suspend doors, plant-bands plus others.

To conclude it is necessary to note that typically the sequence of functions was listed within general and may change based on the particular situation – typically the number of rooms in premise, your own resources, peculiarities regarding the construction associated with the multilevel building. It is based on sound judgment plus every person effective at analysis can individually create such a new sequence.